KATANA HOUSE
  • Hurricane resistant Houses
    • PASSION HOUSES >
      • STUDIO GARDEN POD
      • M1 1BR
      • M3 2BR
      • M5 3BR
      • M7 3+BR
      • M9 2 story
      • VILLAS
      • Customisation options
    • KATANA HOUSES >
      • ONE 一
      • TWO 二
      • THREE 三
      • ONE UP 一上
      • Five UP 五上
      • SIX UP 六上
      • KATANA Addition - KA 加
      • Townhomes
      • Customize your Katana House
    • ECO HOUSES >
      • ONE ECO 1BR
      • TWO ECO 2BR
      • THREE ECO Mini 3br
      • Three ECO XL
      • ECO Duplexes & Quadplexes
      • ECO Additions
    • GUEST & POOL HOUSES
  • HOUSE BUILDING SYSTEMS
    • MODULAR SYSTEM
    • NEWEST TECHNOLOGIES
    • STRUCTURAL LVL & CLT SYSTEM
    • US Building System - MGO SIP
  • ARCHITECTURE & INTERIOR DESIGN
  • SHOP BUILDING & DESIGN STORE
    • SHOP WINDOWS
    • SHOP KITCHENS
    • SHOP FLOORING
    • SHOP DECOR PANELS / DURA PLEX
    • SHOP DOORS
    • OUTDOORS & GARDEN
    • SHOP INTERIOR & HOME DECOR
    • SHOP ART
  • GENERAL CONTRACTING
  • RECENT PROJECTS
  • READY HOUSES GALLERY
  • ORDER YOUR HOUSE
    • ORDERING PROCESS
    • Design order form
  • WHERE TO BUILD
  • FINANCING
  • CONTACT US
  • ABOUT US
  • Blog

ORDERING PROCESS

Ordering process

How to order a Katana House?

The process is simple and straight forward and involves several steps:
1. Initial configuration and Design&Bid Set purchase
Once you have decided on the model and you have the land - the first step is the purchase the model design package / bid-set. This package includes more detailed floorplans, elevations, a cross section and building data that will be necessary for the next steps. Design package also includes placing the layout of the house on your lot plans.
Once the design is ready and signed off by the customer, this design package is the basis for the next steps: engineering (structural, site, civil, MEP). It is also used for contractor bidding, factory kit pricing, and window pricing, and budgeting.
It also allows you to start looking for the necessary  local contractors for site-prep works while we are working through the next steps described below. ​
Design Order FORM
2. Lot feasibility study
You will provide us all the documentation available for the lot including the site plan, property survey, soil test, flood elevation, zoning information, etc. This gives our team a good foundation to understand the site and what has to be done in next steps.
3. Design adaptation to the lot
If necessary, here we can do the adaptation of the plans to your lot of your individual program. This scope of works is done on a retainer basis and we will adjust the necessary changes based on lot specifics and your individual program. 
4. Engineering
Now that the design plans are ready and lot related document package is reviewed - it is time to work on detailed engineering. This step involves structural engineering, civil engineering, mechanical, electrical, plumbing, hvac and other engineering tasks. The cost of these tasks directly depend on the result of the first three steps. A preliminary quote will be provided for each engineering task.
4b. Specialized equipment engineering
Includes solar, energy storage, home automation, smart systems, any other specialized systems, etc.
5. Finishes, specification and interior design
You can choose finishes from our standard offering or we can provide full-scale interior design and decor services and design consulting. Once the choices are made our design team will work with the sourcing team and contractors to coordinate the process.
6. Construction schedule & choice of contractor
Once the engineering is done and all specifications are clear it is time to create the building schedule and determine the responsibilities and scope of work of each party - the factory, supply chain, contractors and designers.
7. Permitting
You can apply for the permits yourself or a general contractor can do it. Permitting process usually involves local fees including impact fees, permit fees, utility fees, etc. Since cities and municipalities are very different, this is one of the only parts where we can not predict the time it will take. Getting a permit can take a couple weeks or in some places up to several months.
8. Placing the order for a house kit
As permits are obtained the off-site house kit manufacturing can start simultaneously with the ground works. It is time to place the house kit order. In some cases customers pre-order the materials in an earlier stage. If you are working with our designers on the finishes, fixtures and furnishings it is also a good time to start ordering necessary finishes.
9. Ground works & foundation
Ground works and foundation is built based on soil conditions, factory guidelines and local requirements by a general contractor. It all happens simultaneously while the house kit is in production and windows and doors are being manufactured..
10. House delivery
As the factory installation team has confirmed the compliance of foundation and house kit is ready for delivery and kit has been fully paid, the kit is delivered to the site.
11. Installation
Your house is being installed on a foundation by factory-certified installers. In some cases, factory sends instructors, and local contractors do assembly works. In other cases it is a factory installation crew. Installation includes assembly, and works up to the point that the house is watertight.
12. Finishes
The chosen installer team installs pre-ordered finishes. Includes exterior and interior finishes, fixtures and appliances. 
12b. Specialized equipment
This part is optional and can include solar power, energy storage, smart home systems, hydroponics, smart ventilation, automation, etc.
13. Landscaping
As construction works are finalized and site is cleared from construction equipment - landscaping takes place. Landscapong is typically done locally.
14. Obtaining Certificate of Occupancy
Final inspections are done, all payments are settled and Certificate of Occupancy is issued.
15. Move-in
House orientation is provided and you can move in and enjoy your new KATANA HOUSE

Pricing guidelines for each step

Pricing guideline as per the 15 steps above:
While the price of a finished house depends on a thousand different variables and is estimated in the Soft Cost phase - here are the cost position guidelines and possible starting prices. Note that they differ by region. In general you can refer to standard high-quality building costs for the same level of finishes based on high energy efficiency standards in your area using a +/- 25% variable. 
Part 1: Soft Costs
1. Initial Design package & Bid Set purchase
The design package / bid set price varies by components chosen and is from 3.000$ to 20.000$+ and depends on the house model's size.  For example, ONE series starts at 3000$, All 24ft series (TWO and Three MINI) start at 6000$ and all 36ft (THREE LUX and ECO) start at 9000$. Additions are from 1500 - 3000$. PassionHouses line design pricing - please inquire. 
2. Lot feasibility study
From 1000$
3. Design adaptation to the lot and individual changes
From 2000$
4. Engineering
From 4000$ for structural engineering, from 3000$ for MEP, special engineering - based on the scope of works and house size.
5. Interior design services
Interior design project from 1500$ + material sourcing costs. Design consultations from 200$ for 1st h, 100$/h after.
​6. Construction schedule and choice of contractor
No cost
7. Permitting & fees
Please check with your city or municipality what type of fees there will be.
Part 2: Construction costs
​
Construction cost guidelines, Total costs for works above the foundation, turn-key, excl. soft costs.
Florida pricing at time of publishing. Prices vary by location. (Katana House may not provide all construction phases in all regions) :
Katana ECO - from 150$/sf and up
Katana House - from 200$/sf and up
Ultimate high-end individual program from 300$/sf and up
​8. Placing the order of a house kit (panels, glass systems, doors, etc. that are manufactured on demand)
Down payment 50% at material order 
30% at production start
20% before material shipping
9. Groundworks and foundation
Site-specific, starting from 15$/sf + utilities 
10. House delivery
Based on location - from 3000$ per flatbed truck or from 5000$ per each 40ft HC container for overseas shipping. (bigger houses are several truckloads or containers. Components for finishes will ship separately).
11.Installation
Site & location specific
12. Finishes
Cost based on clients choices
13. Landscaping
Site-specific
14. Obtaining the Certificate of occupancy
Location-specific
15. Move in
49.95$ for a set of glasses (champagne provided by Katana House).

Services

SMART DESIGN HOUSES
ARCHITECTURE DESIGN
INTERIOR DESIGN
SHOP COMPONENTS

Company

ABOUT US
​BE OUR REPRESENTATIVE
FOR DEVELOPERS

Support

CONTACT US
FAQ
© COPYRIGHT 2002-2021 KATANA GROUP & Katana House Corporation  ALL RIGHTS RESERVED.
  • Hurricane resistant Houses
    • PASSION HOUSES >
      • STUDIO GARDEN POD
      • M1 1BR
      • M3 2BR
      • M5 3BR
      • M7 3+BR
      • M9 2 story
      • VILLAS
      • Customisation options
    • KATANA HOUSES >
      • ONE 一
      • TWO 二
      • THREE 三
      • ONE UP 一上
      • Five UP 五上
      • SIX UP 六上
      • KATANA Addition - KA 加
      • Townhomes
      • Customize your Katana House
    • ECO HOUSES >
      • ONE ECO 1BR
      • TWO ECO 2BR
      • THREE ECO Mini 3br
      • Three ECO XL
      • ECO Duplexes & Quadplexes
      • ECO Additions
    • GUEST & POOL HOUSES
  • HOUSE BUILDING SYSTEMS
    • MODULAR SYSTEM
    • NEWEST TECHNOLOGIES
    • STRUCTURAL LVL & CLT SYSTEM
    • US Building System - MGO SIP
  • ARCHITECTURE & INTERIOR DESIGN
  • SHOP BUILDING & DESIGN STORE
    • SHOP WINDOWS
    • SHOP KITCHENS
    • SHOP FLOORING
    • SHOP DECOR PANELS / DURA PLEX
    • SHOP DOORS
    • OUTDOORS & GARDEN
    • SHOP INTERIOR & HOME DECOR
    • SHOP ART
  • GENERAL CONTRACTING
  • RECENT PROJECTS
  • READY HOUSES GALLERY
  • ORDER YOUR HOUSE
    • ORDERING PROCESS
    • Design order form
  • WHERE TO BUILD
  • FINANCING
  • CONTACT US
  • ABOUT US
  • Blog